FINANCED PROJECTS

NRRP financed projects

1ST PROJECT

REDUCTION OF LOSSES IN WATER DISTRIBUTION NETWORKS, INCLUDING DIGITALISATION AND MONITORING – THIRD TIME WINDOW. PROJECT CODE M2C4-I4.2_157

Investment amount: € 12.745.300
NRRP Financing Amount: € 11.206.980
Importo Finanziamento da tariffa: € 1.538.320
CUP: F51D2200050006
Beneficiary Entity-1st level Implementing Party: ‘Valle del Chiampo’ Basin Council
2nd level Implementing Party: RTI Acque del Chiampo S.p.A. Benefit Corporation and Medio Chiampo SpA

Projects aimed at the digitalisation of the network to reduce water losses.

The project involves the application of measures aimed at reducing losses in water distribution networks, in compliance with the provisions of the call to tender. The second level implementing entity is RTI Acque del Chiampo S.p.A. Benefit Corporation and Medio Chiampo S.p.A. of ATO Valle del Chiampo, which manages the Integrated Water Service in the 13 municipalities of the valley. The project concerns a population served by the water service of over 100,000 inhabitants. All the measures are aimed at reducing losses through the digitalisation and monitoring of the water networks managed. The project entails splitting into districts a total of 879 km of network by 31/03/2026 with a reduction in the M1b loss indicator of 36%.

ItaliaDomani: www.italiadomani.gov.it

Ministry of Infrastructure and Transport: www.mit.gov.it

Acque del Chiampo | FINANCED PROJECTS

2ND PROJECT

UPGRADING OF THE ARZIGNANO (VI) INDUSTRIAL AND RESIDENTIAL TREATMENT PLANT. NEW CIVIL SETTLING TANKS 3 AND 4. PROJECT CODE M2C4.4-I.4.4

Investment amount: € 4.610.000,00
NRRP Financing Amount: € 1.150.000,00
Financing Amount from rates: € 3.460.000
CUP: C32E22000110005
Implementing Entity: ‘Valle del Chiampo’ Basin Council
Soggetto Attuatore esterno: Acque del Chiampo S.p.A. Benefit Corporation

Sewerage and treatment investments.

The project falls within the 1st lot 1st section of the final project approved with environmental impact assessment provision DGRV 913/2016 and involves the construction of two sedimentation basins for the sludge from residential oxidation-nitrification, in addition to the two existing sedimentation tanks, in order to manage the increased hydraulic load from the civil sewerage system. As regards electromechanical equipment, the solution selected includes a sludge collection device based on the back and forth movement of hydrodynamically shaped bottom blades. The sludge collected at the bottom is then removed with a system that ensures its continuous removal and this is done by means of a series of pipes arranged vertically along the entire width of the tank: by exploiting the siphon effect, the sludge is sucked through the pipes and conveyed to a common sludge channel.